Productivity is a measure of the efficiency of a person, machine, factory, a system, etc., in converting inputs into useful outputs. A productivity measure is expressed as the ratio of output to inputs used in a production process, i.e. output per unit of input.

Work-Study:
Work-study is the systematic evaluation of methods of performing works so as to improve the effective use of resources and to standardize the activities for performing a job.

      The major branches of Work-Study:
1. Method study
2. Motion Study
3. Work measurement: (time study and work sampling)

1. Method study
Method study is the systematic recording and critical analysis of existing and proposed ways of doing work, to develop and apply more effective methods.
     Process of method study:
  • Define the existing method
  • Record
  • Examine
  • Develop new
  • Define new
  • Install new
  • Maintain new
 
   2. Motion study
Motion study is a systematic method of deciding the best way of doing the work by inspecting the motions made by the worker or the machine.  Frank Gilbreth  and Lillian Gilbreth introduced the idea of motion study as a science of eliminating the wastefulness due to unnecessary motions.


   3.  Work measurement:
Work measurement is the application of techniques and procedures to establish the time for a qualified worker to carry out a task at a defined rate of working or at a defined level of performance. Work measurement is also used for determining the level and vertical and horizontal order of the works in an organization.  

The Techniques of Work Measurement:
- Time study:
Time study is a systematic process of examining and determining human work with help of a timing device to decide the time needed for performing an entire work while working at a definite level of performance.
Work sampling:
 Work sampling is the statistical technique to determine the average time spent by employees in various portions or categories of a job such as setting up a machine, drilling,  assembling two parts, etc.. 


1 comment:

  1. IEEE Final Year projects Project Center in Chennai are consistently sought after. Final Year Students Projects take a shot at them to improve their aptitudes, while specialists like the enjoyment in interfering with innovation. For experts, it's an alternate ball game through and through. Smaller than expected IEEE Final Year project centers ground for all fragments of CSE & IT engineers hoping to assemble. Final Year Project Domains for IT It gives you tips and rules that is progressively critical to consider while choosing any final year project point.

    JavaScript Training in Chennai

    JavaScript Training in Chennai

    The Angular Training covers a wide range of topics including Components, project projects for cseAngular Directives, Angular Services, Pipes, security fundamentals, Routing, and Angular programmability. The new Angular TRaining will lay the foundation you need to specialise in Single Page Application developer. Angular Training

    ReplyDelete